Low Quartile Mining Cost ~ $17.60 US/t
• Seymourville PEA costs(
1.
)
• Quarrying and Rehab Cost
• Wash & Dry Plant
• G&A fixed Cost
• Total Mine site Cost
• Trucking to Winnipeg
• Winnipeg transload
• Royalties (FN, Venders)
• Total Operating Cost to Rail
• Winnipeg Logistics savings vs
Wisconsin (1000km @ $.04t)
• $ Canadian
• $5.30
• $13.30
• $3.40
$22.00t
• $22.20
• $.80
• $5.00
• $50.00 tonne
• $40.00 tonne
33
(1.) Mining 6 months, processing on site 12 months, shipping 10 months